🏠Home

349(Solved): Irp2 Has no SCADA system. Need a Scada system at irp2 scada room.

Posted on 31st May 2023, 4:37pm by [email protected]

2023-06-02 07:50:55pm: Scheduled at 2023-06-03, Required entity: Monitor. -by: Md. Khairul Momen
2023-06-03 09:14:40am: Status changed to Ongoing, Because of: Today we check the IRP2 electrical panel room to re-establish SCADA System for IRP2 monitoring. 1. We can establish the system previous place. 2. A new server rack was installed before. we can setup the system in it. -by: Parves
2023-06-03 12:56:55pm: Status changed to Hold, Because of: For this work PC monitor, Display port cable, Multiplug, UTP cable is needed. Than we could do this work. -by: Parves
2023-08-07 03:37:42pm: Status changed to Hold, Because of: Need required materials. -by: MD ABDUL MOMIN
2024-05-16 08:39:33am: Status changed to Solved, Because of: IRP-2 SCADA system installation done by 56 inches diplay. -by: Parves

No Attachment Found

No Feedback from Field Yet